BPBIM PRODUCTION COPILOTGOVERNANCE BEFORE GEOMETRY
AUTHORIZED REAL-PROJECT DEMO

ROLE-SEPARATED EVIDENCE + MODEL GOVERNANCE

Cross-check evidence before BIM production begins.

Separate roles research traceable drawing evidence, classify readiness, control modeling scope, and independently review results before authority promotion.

14accepted evidence records
2real readiness outcomes
5separated role boundaries
Publication-authorized stair candidate shown within a redacted BIM context
ISOLATED WORK CANDIDATEPublication-authorized, redacted project view

HOW THE PRODUCT WORKS

Evidence is cross-checked before geometry. Models are cross-checked before authority.

This demonstration proves a role-separated agent workflow. One evidence-research capability covers multiple disciplines; it does not claim three simultaneous specialist agents.

01 · EVIDENCE RESEARCH

Traceable source claims

ARCHITECTURAL PLANSTRUCTURAL DETAILSECTION / DETAIL

An external research role records source, region, discipline, confidence and authorization.

02 · READINESS ENGINE

Cross-check requirements

STAIR · 14 / 14 → READYINTERFACE · MISSING → HUMAN

A separate reasoning role decides whether evidence closes the scope. No evidence means no model.

03 · CONTROLLED MODELING

Package before production

READY → WORK PACKAGEISOLATED WORK ONLY

The builder receives explicit targets and protected non-targets. Authority remains read-only.

04 · INDEPENDENT CHECKS

Model result cross-check

FULL REGRESSIONREAD-ONLY REVIEWER

The reviewer is a separate session and cannot build, repair, reclassify, or self-promote.

CROSS-SOURCE EVIDENCE MATRIX

The sources close different parts of one bounded stair requirement set.

Complementary requirement closure across authorized sources — not a claim that every value is independently duplicated.

RequirementAuthorized sourceAccepted valueDecision
Flight widthArchitectural plan1,200 mmACCEPTED
Floor heightArchitectural section4,200 mmACCEPTED
Waist thicknessStructural detail150 mmACCEPTED
STAIR SCOPE14 / 14 requirements closedREADY_TO_MODEL
ADJACENT INTERFACENo approved architectural or structural evidence registeredHUMAN_CLARIFICATION_REQUIRED

PROJECT READINESS

Every item ends in exactly one state.

Counts below are measured from two real decision artifacts. Zero is a real result.

READY TO MODEL1
CROSSCHECK0
HUMAN CLARIFICATION1
COORDINATION0
BLOCKED0

ETA-01 · MACHINE DECISION

Stair work package

READY_TO_MODEL
MODELINGALLOWED IN ISOLATED WORK ONLY
Decision reason
Fourteen accepted evidence records close geometry, elevation, orientation and interface requirements against the live authority baseline.
Missing / conflicting
None. Unresolved assumptions: 0.
Recommended next action
Approved by a separate read-only reviewer and promoted by the controlling authority role.
Work package
CONTROLLED PACKAGE ETA-01
Current REV status
New authority REV created — confidential identifier withheld
Publication-authorized redacted stair drawing with traceable measured valuesDRAWING EVIDENCE · REDACTED FOR PUBLICATION
4,200 mmfloor height99% CONF.
1,200 mmflight width96% CONF.
250 mmtread depth99% CONF.
13 + 12riser split98% CONF.

CONTROLLED PRODUCTION CYCLE

Independent review passed. A new REV was created.

VERIFIED FINAL STATUS
01Evidence14 accepted records
02Data audit34 / 34
03Regression15 / 15
04Non-target diff0 across 2,334
05Bonsai GUIPASS · IFC unchanged
06Independent reviewPASS — 0 / 0 / 0
07New authority REVNEW REV CREATED

A REAL DEFECT THE GATE STOPPED

A correct stair almost changed 508 unrelated BIM products.

The stair passed in isolation. The first integrated WORK candidate did not. Authority Gate blocked 508 unintended non-target representation differences before promotion, so the authoritative BIM was never modified.

BEFOREINITIAL WORK INTEGRATION
Isolated stair audit34 / 34 PASS
Authority regressionBLOCKED · 14 / 15
508unintended non-target
representation differences

350 slabs · 124 beams · 19 annotations · 13 columns · 2 stairs

ROOT CAUSESHARED IFC CONTEXT

World coordinate system Y

02,400 mm
A shared representation context was changed inside the candidate. The Gate detected its downstream fingerprint impact.
AFTERWORK-ONLY REPAIR
0 / 2,334protected non-target differences
  • Regression rerun 15 / 15 PASS
  • Independent review 0 / 0 / 0
  • Authority source UNCHANGED
34 / 34
STAIR PASS
508
GATE BLOCKED
WORK ONLY
CONTEXT REPAIRED
0 / 2,334
REVIEW + PROMOTION

AUTHORITY INTEGRITY

One writer. Separate reviewer. Controlled promotion.

AUTHORITY
READ ONLY
WORK
ISOLATED
REVIEW
INDEPENDENT
NEW REV
PROMOTED
REV227 — unchanged
VERIFIED — VALUE WITHHELD
WORK-ETA-01 — reviewed
INDEPENDENT REVIEW · 0 / 0 / 0
REV228 — created
CONTROLLED PROMOTION
Source authority SHA-256
VERIFIED — VALUE WITHHELD
New authority SHA-256
VERIFIED — VALUE WITHHELD
Authority source
UNCHANGED